Our engineers have worked on process facilities at the top end of the scale. Client names and site identities are covered by confidentiality; the technical profile of the work is not.

Refining

Greenfield refinery, 12 million tonnes per year

ScopeFire safety justification for the complex, protection philosophy, design basisFacilityFull refinery, process units and offsitesRoleFire safety engineering
Petrochemicals

Petrochemical complex, up to 10 million tonnes per year of feedstock

ScopeSingle fire safety concept for the whole complex, fire brigade sizing and equipment justification, gas rescue service resourcing, review through to approvalFacility18 separate work packages on one siteRoleLead fire safety engineering
LNG

LNG plant, 6 million tonnes per year and above

ScopeFire station manning and equipment justification, gas rescue service resourcingFacilityLiquefaction plant in an arctic environmentRoleSpecialist analysis
Petrochemicals

Polyolefin complex, 2 million tonnes per year

ScopeDetailed design of fire protection systemsFacilityIncluding 800 kt/y and 700 kt/y polyethylene linesRoleDesign
Integrated delivery

Single integrated fire protection system across 100 facilities

ScopeFrom adaptation of the licensor basic design through to commissioningFacility40 process units and 60 utilities and offsite facilities on one siteRoleMain automation contractor for fire protection
International interface

Delivery under an international EPC contractor’s regime

ScopeInterface management with the EPC contractor’s requirements, factory acceptance and integrated factory acceptance testing before shipmentFacilityPetrochemical project with a Chinese EPC partnerRoleFire protection package

We do not publish contract values, and we name a client only with written permission. Where a client cannot be named, the asset type, scale and our role are stated instead — nothing is invented and nothing is quietly omitted.